Unchanged Priority Number
Conditions when the priority number of a leaf is not changed.
The priority number recalculation is not performed after moving a leaf to the same place. The scenarios below explain the context when the priority number of the moved leaf remains the same. Scenario 1:
The initial assembly is created for eCTD 4.0 sequence with the following structure and Leaf 1 is moved to the Folder 1 section.
Root
Folder 1
Leaf 1
Scenario 2:
The initial assembly is created for eCTD 4.0 sequence with the following structure and Leaf 2 is moved between Leaf 1 and Leaf 3.
Root
Folder 1
Leaf 1
Leaf 2
Leaf 3
Scenario 3:
The initial assembly is created for eCTD 4.0 sequence with the following structure and Leaf 2 is moved between Leaf 2 and Leaf 3.
Root
Folder 1
Leaf 1
Leaf 2
Leaf 3
Scenario 4:
The initial assembly is created for eCTD 4.0 sequence with the following structure and Leaf 1 is moved above Folder 1_1, Leaf_2 is moved between Folder 1_2 and Folder 1_3, Leaf_3 is moved under Folder 1_4.
Root 1
Folder 1
Folder 1_1
Leaf 1
Leaf 2
Folder 1_2
Folder 1_3
Leaf 3
Folder 1_4
Scenario 5:
The priority number is not updated:
— When a submission is added to a life cycle.
— When the Replace operation is performed.
— When the Suspend operation is performed.
